DCAA Audit Preparation Checklist

Audit Preparation Timeline

60 Days Before
Internal Pre-Audit Review
Conduct comprehensive internal audit using DCAA checklist. Identify and remediate any issues.
30 Days Before
Documentation Gathering
Compile all required documentation, policies, and reports. Verify completeness and accuracy.
14 Days Before
Team Preparation
Brief all employees on audit procedures. Conduct mock interviews and floor checks.
7 Days Before
Final Review
Verify system access, run test reports, ensure all corrections are complete.
Audit Day
Execution
Designated point of contact ready, workspace prepared, all documentation accessible.

System & Technical Readiness

☐
Timekeeping system demonstration ready - Can show all features live
☐
Test accounts created - Demo employee for system walkthrough
☐
Audit trail verified - Can demonstrate complete change tracking
☐
Report generation tested - All standard reports run without errors
☐
System access controls documented - User permissions matrix available
☐
Data backup verified - Recent backup available for recovery if needed
☐
Integration points tested - QuickBooks/payroll sync functioning

Required Documentation

Document TypeDescriptionStatus
Timekeeping PolicyWritten procedures for time entry, approval, corrections☐ Ready
Employee AcknowledgmentsSigned statements from all employees confirming policy understanding☐ Ready
Training RecordsDocumentation of timekeeping training for all employees☐ Ready
Organizational ChartCurrent org chart showing reporting relationships☐ Ready
Labor Distribution ReportsSample reports showing labor allocation by contract☐ Ready
Payroll ReconciliationDocumentation showing timesheet/payroll alignment☐ Ready
Correction LogsRecords of all timesheet corrections with justifications☐ Ready
System DocumentationUser guides, admin procedures, security protocols☐ Ready
Contract ListAll active contracts with labor categories and rates☐ Ready
Internal Audit ReportsResults from recent internal compliance reviews☐ Ready

Employee Preparation

☐
All employees briefed on audit process
☐
Floor check procedures communicated
☐
Key personnel identified and available
☐
Timesheet compliance verified for all employees
☐
Recent timesheet issues resolved and documented
☐
Employee interview talking points prepared

Data Validation Checks

Last 90 Days Review

☐
No missing timesheets - All employees have submitted for all periods
☐
All timesheets approved - Supervisor approvals documented
☐
Daily entry compliance - No patterns of weekly batch entry
☐
Labor distribution accurate - Charges align with actual work performed
☐
Corrections documented - All changes have proper justification
☐
Unallowable costs segregated - Properly identified and excluded

Common Audit Focus Areas

Floor Check Readiness

DCAA may conduct unannounced floor checks. Ensure employees know:

☐
What project/contract they're currently charging time to
☐
How to access and demonstrate the timekeeping system
☐
Their timesheet is current (entered daily)
☐
Company timekeeping policies and procedures
☐
Who to contact if auditor has questions

Workspace & Logistics

☐
Dedicated audit room prepared - Private, secure space with internet
☐
Computer/printer access arranged - For auditor use if requested
☐
Document reproduction capability - Copier/scanner available
☐
Parking/access badges arranged - For multi-day audits
☐
Point of contact designated - Single liaison for auditor requests

Report Generation Checklist

Prepare these reports in advance:

☐
Employee timesheet summary (last 3-6 months)
☐
Labor distribution by contract/project
☐
Indirect labor allocation reports
☐
Exception reports (missing/late timesheets)
☐
Correction/adjustment reports with audit trails
☐
Payroll reconciliation reports
☐
User access and permissions reports

💡 Pro Tips for Audit Success

Post-Audit Actions

☐
Debrief with team - Review what went well and areas for improvement
☐
Document findings - Create action plan for any issues identified
☐
Implement corrections - Address findings within specified timeframe
☐
Update procedures - Revise policies based on audit feedback
☐
Schedule follow-up - Plan internal review to verify corrections